As of now, we can submit 3 CJs per week. So that makes it 12 CJs in a month. But as we know, the cycle goes for more than a week.
So I was wondering, what if we were allowed to submit more CJs per cycle? Say a 7/8 CJs a month?
The mods can anyways have a month to check the CJs.
And not everyone will have 7 CJs to submit. So in the long run, it's a win-win for everyone.
Your thoughts?
So I was wondering, what if we were allowed to submit more CJs per cycle? Say a 7/8 CJs a month?
The mods can anyways have a month to check the CJs.
And not everyone will have 7 CJs to submit. So in the long run, it's a win-win for everyone.
Your thoughts?